2024 Catalog Sign-up
CATALOG SIGN-UP
HOLIDAY SHIPPING DEADLINES
Note: Orders should be placed before 11AM PST on the cut-off day in order to arrive on or before Christmas.
U.S. to U.S. Tue 12/12 Web 12/13 Thu 12/14 Fri 12/15 Sat 12/16 Sun 12/17 Mon 12/18 Tue 12/19 Web 12/20 Thu 12/21 Fri 12/22 Sat 12/23 Sun 12/24 Sun 12/25
UPS Standard                      
UPS Ground                      
UPS 3 Day Select                      
UPS Saver                      
UPS 2nd Day Air                      
UPS Next Day Air                      
SHIPPING TYPE: PLACE ORDER BY:
UPS Standard Wednesday, Dec 13
UPS Ground Thursday, Dec 14
UPS 3 Day Select Monday, Dec 18
UPS Saver Wednesday, Dec 20
UPS 2nd Day Air Wednesday, Dec 20
UPS Next Day Air Thursday, Dec 21
Shipping with InnovaToys
We understand that no one likes to be surprised with expensive shipping rates as you’re checking out.
We also understand that it is important for you to know where your parcel is.
Here at InnovaToys, we design our shipping services to save you money and to provide you with peace of mind.
 
MMS001

Golden Gate Bridge

Manufacturer: Metal Earth
$6.95
In stock

Golden Gate Bridge

Add to Wishlist
number of sheet
1
Flat Sheet(s)
Difficulty Level
19
Pieces
2/ 10
Difficulty Level
MMS001-this-becomes-this

MMS001-dimensions
Product Information
Item Number: MMS001
Number of Sheets: 1 (4.3" x 4.3")
Product Dimensions: 5.91" L x 0.31" W x 1.77" H
(15 L x 0.8 W x 4.5 H cm)
Ages: 14+
Difficulty Level:
2

Description

The Golden Gate is an art deco suspension bridge that stretches across San Francisco Bay and is one of the most enduring symbols of the city. Its construction arose from the need to get from San Francisco to Marin County, California and the ferry traffic in San Francisco Bay had become just too heavy. Construction on the Golden Gate Bridge began in 1933, and was completed in 1937.

MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge

What’s Inside

MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge
instruction sheet MMS001 - Golden Gate Bridge  img
Click to View
or
MMS001

How To Build

Parts can be more easily removed from the sheet using a pair of clippers. A pair of tweezers or needle nose pliers are highly recommended during assembly. Plan out and understand how the parts will come together.

MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge
MMS001 - Golden Gate Bridge

Average Rating

0
(0 reviews)
5
0%
0%
4
0%
0%
3
0%
0%
2
0%
0%
1
0%
0%
Existing reviews